UPSI Digital Repository (UDRep)
Start | FAQ | About
Menu Icon

QR Code Link :

Type :article
Subject :TH Building construction
Main Author :Mohamed Nor Azhari Azman
Additional Authors :Mohd Nasrun Mohd Nawi
Najuwa Mohd Nasir
Moh Khairudin
Title :Investigating factors of delay in ibs construction project: manufacturer perspectives
Place of Production :Tanjong Malim
Publisher :Fakulti Teknikal dan Vokasional
Year of Publication :2019
Corporate Name :Universiti Pendidikan Sultan Idris

Abstract : Universiti Pendidikan Sultan Idris
Government of Malaysia has enthusiastically supported the implementation of Industrialized Building System (IBS) that was early introduced in 1960’s. IBS is seen capable to ease the problem of delay that has been long haunting Malaysian construction industry. However, the issue of delay still exists even though IBS has been implemented in construction project and it is believed that there are other factors causing delay in IBS project. Thus, this paper aims to identify the factors of delay in IBS construction project through semi-structured interviews. Data on the study variables has been collected through interviews were conducted to explore the real-life construction situation in Malaysia. Factors of delay in IBS construction project are application of casting in-site by client, usage of dry mix cement, not fully implementation IBS method by clients in construction works, changes in design by client, delay in conforming the building design by client, delay in payment from client and delay of materials delivery from supplier. As an overall, results indicated that client-related factors are the most significant contributors in the delay of IBS project. The phenomena of delay in IBS construction project may require serious attention in overcoming the potential of delay factors and enhance the sustainability of IBS implementation in Malaysian construction industry.

References

1. Bari, N.A.A.; Yusuff, R.M.; Ismail, N.; and Jaapar, A. (2018). Industrialised Building Systems (IBS): It ’s attribute towards enhancing sustainability in construction. Asian Journal of Environment-Behaviour Studies, 3(8), 109-119.

2. Azman, M.N.A.; Ahamad, M.S.S.; Majid, T.A.; Yahaya, A.S.; Hanafi, M.H. (2013). Statistical evaluation of pre-selection criteria for industrialized building system (IBS). Journal of Civil Engineering and Management, 19(sup1), S131-S140.

3. Noor, S.R.M.; Yunus, R.; Abdullah, A.H.; Nagapan, S.; Syahir, S.M.; and Mazlan, S. (2018). Insights into the adoption of lean management in Industrialised Building System (IBS) implementation: the drivers and challenges. International Journal of Engineering & Technology, 7(3.23), 22-31.

4. Nawi, M.N.M.; Lee, A.; Mydin, M.A.O.; Osman, W.N.; and Rofie, M.K. (2018). Supply chain management (SCM): disintegration team factors in Malaysian Industrialised Building System (IBS) construction projects. International Journal of Supply Chain Management, 7(1), 140-143.

5. Kumar, A.; Chaurasia, A.; Lala, S.; Kumar, A.; and Nolastname, V. (2016). Prefabricated foundation system for single storey houses. Journal for the Advancement of Performance Information & Value, 8(2), 78-91.

6. Azman, M.N.A.; Majid, T.A.; Ahamad, M.S.S.; and Hanafi, M.H. (2011). A study on the trend of the use of IBS components and the setting UP of IBS  manufacturing factories in the malaysian construction industry. Malaysian Construction Research Journal, 9(2), 18-30.

7. Nawi, M.N.M.; Lee, A.; Azman, M.N.A.; and Kamar, K.A.M. (2014). Fragmentation issue in Malaysian industrialised building system (IBS) projects. Journal of Engineering Science and Technology (JESTEC), 9(1), 97-106.

8. Kamar, K.A.M.; Alshawi, M.; and Hamid, Z.A. (2009). Barriers to industrialized building system (IBS): The case of Malaysia. In Proceedings of the BuHu 9th International Postgraduate Research Conference (IPGRC), Salford, UK.

9. Dong, Y.H.; and Ng, S.T. (2015). A life cycle assessment model for evaluating the environmental impacts of building construction in Hong Kong. Building and Environment, 89, 183-191.

10. Duggal, S.K. (2017). Building materials. Taylor and Francis, New York..

11. Dineshkumar, N.; and Kathirvel, P. (2015). Comparative study on prefabrication construction with cast in-situ construction of residential buildings. International Journal of Innovative Science, Engineering & Technology, 2(4), 527-532.

12. Ferraris, C.F. (2001). Concrete mixing methods and concrete mixers: state of the art. Journal of Research of the National Institute of Standards and Technology, 106(2), 391-399.

13. Mohamad, D.; Ramli, M.Z.; Danuri, H.N.; and Sapuan, W.K. (2016). Demand of the Industrialized Building System (IBS) implementation in Malaysian government projects. Journal of Scientific Research and Development, 3(4), 77-82.

14. Olawale, Y.A.; and Sun, M. (2010). Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509-526.

15. Cheng, J.; Proverbs, D.G.; and Oduoza, C.F. (2006). The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), 567-583.

16. Abdul-rahman, H.; Wang, C.; Takim, R.; and Wong, S. (2011). Project schedule influenced by financial issues?: Evidence in construction industry. Scientific Research and Essay, 6(1), 205-212.

17. Zhang, W. (2018). Optimizing Value and Risk based on Client Expectation in Construction Industry using Intelligent Algorithm?: A Case- Study in New Zealand. Asian Journal of Applied Science and Technology, 2(1), 154-168.

 


This material may be protected under Copyright Act which governs the making of photocopies or reproductions of copyrighted materials.
You may use the digitized material for private study, scholarship, or research.

Back to previous page

Installed and configured by Bahagian Automasi, Perpustakaan Tuanku Bainun, Universiti Pendidikan Sultan Idris
If you have enquiries, kindly contact us at pustakasys@upsi.edu.my or 016-3630263. Office hours only.