UPSI Digital Repository (UDRep)
|
|
|
Abstract : Universiti Pendidikan Sultan Idris |
Vendor managed inventory (VMI) is an illustration of effective partnering and collaboration practices between upstream and downstream points in a supply chain. VMI policy is an integrating decision between a supplier and the customers in which the supplier takes the accountability of sustaining the customers’ inventory while confirming that no stock-out. The supplier indicates when each delivery time takes place, so that the customers are no longer responses to the customers' orders. Under the VMI system, the planning is proactive as it is based on the available information rather than reactive to customers' orders. Consequently, in this paper, we expected that the demand at the construction sites are constant and stationary, and the construction consolidation centre (CCC) is implementing a VMI system. The concentration of this paper is to minimize the transportation and inventory holding costs of the customers for a two-stage supply chain system in the construction industry. The problem is to identify what is the delivery quantities to the construction sites, what is delivery times and which routes should be used to deliver products to the customers at the construction site for the single-period deterministic inventory routing problem (SP-DIRP) in the construction sector. Furthermore, realistic side-constraints such as driving time restrictions, storage capacities constraints and constant replacement intervals are considered. Results of a simplified real-life case implementing the proposed linear mixed-integer program are shown and discussed in detail.
|
References |
[1] Agerberg, John-Niclas., Johansson, Jesper and Hohansson, Niclas, “Tredjepartslogistik I ett nybyggnadsprojekt,” Chalmers University of Technology, Gothenburg, 2010. [2] Thomas, H. Randolph. Horman, Michael J., de Souza, Ubiraci Espinelli Lemes., and Zav?ski, Ivica, “Reducing Variability to Improve Performance as a Lean Construction Principle”, Journal of Construction Engineering and Management. 128(2), 144-154, 2002. [3] Veiseth, Mads. Røstad, Carl Christian. and Andersen, Bjørn, “Productivity and logistic in the construction industry – what can the construction industry learn from stationary industry?”, [Online] http://www.prestasjonsledelse.net/publikasjoner/Pap er%20for%20the%20Nordnet%202003%20conferen ce_final.pdf, 2003. [4] Harrison, Alan and van Hoek, Remko., “Logistics Management and Strategy”, 3rd ed. Essex: Pearson Education Limited, 2008. [5] Claassen, Marloes f. T., van Weele, Arjan f. and van Raaij, Erik M, “Performance outcomes and success factors of vendor managed inventory (VMI)”, Supply Chain Management: An International Journal, 13 (6), 406-414, 2008. [6] Bell, W.J., Dalberto, L.M., Fisher, M.L., Greenfield, A.J., Jaikumar, R., Kedia, P., Mack, R.G., and Prutzman, P.J, “Improving the distribution of industrial gases with an on-line computerized routing and scheduling optimizer”, Interfaces, 13(6), 4-23, 1983. [7] Andersson H., Hoff A., Christiansen M., Hasle G., and Løkketangen A, “Industrial aspects and iterature survey: combined inventory management and routing”, Computer Operations Research, 37(9), 1515-1536, 2010. [8] Coelho, L.C., Cordeau, J-F., and Laporte, G, “Thirty years of inventory routing”, Transportation Science, 48(1), 1-19, 2014. [9] Federgruen, A., and Zipkin, P, “A combined vehicle routing and inventory allocation problem”, Operations Research, 32, 1019-1037, 1984. [10] Dror, M., and Ball, M, “Inventory-routing: reduction from an annual to a short period problem”, Naval Research Logistics Quarterly, 34, 891-905, 1987. [11] Trudeau, P. and Dror, M, “Stochastic inventory routing: route design with stockouts and route failures”, Transportation Science, 26(3), 171-184. [Accessed 10th May 2010], 1992. [12] Campbell, A.M., and Savelsbergh, M.W.P, “A decomposition approach for the inventory routing problem”, Transportation Science, 38(4), 488-502, 2004. [13] Aghezzaf, E.-H, “Robust distribution planning for the supplier-managed inventory agreements when demand rates and travel times are stationary”, Journal of the Operational Research Society, 59(8), 1055-1065, 2008. [14] Yu, Y., Chen, H., and Chu, F, “A new model and hybrid approach for large scale inventory routing problem”, European Journal of Operational Research, 189 (3), 1022-1040, 2008. [15] Taarit, N.B., Hadj-Alouane, A.B., and Zaghal Mansour, F, “A Lagrangian heuristic method and an iterative approach for the inventory routing problem”, 8th International Conference of Modeling and Simulation (MOSIM'10), Hammamet, Tunisia, 2010. [16] Solyali, O., and Sural, H, “The one-warehouse multiretailer problem: Reformulation, classification, and computational results”, Annals of Operations Research, 196, 517-541, 2012. [17] Bertazzi, L., Bosco, A., Guerriero, F., and Lagana, D, “A stochastic inventory routing problem with stockout”, Transportation Science Part C: Emerging Technologies, 27, 89-107, 2013. [18] Rahim, M.K.I.A., Zhong, Y., Aghezzaf, E.-H., and Aouam, T, “Modeling and Solving the Multi-period Inventory Routing Problem with Stochastic Stationary Demand Rates”, International Journal of Production Research, 52 (14), 4351-4363, 2014. [19] Rahim, M. K. I. A., Aghezzaf, E. H., Limère, V., & Raa, B, “Analysing the effectiveness of vendor- managed inventory in a single -warehouse, multiple-retailer system”, International Journal of Systems Science, 47 (8), 1953 -1965, 2016. [20] Rahim, M. K. I. A., Nadarajan, S., & Ahmad, M. A, “Solving the Single -Period Inventory Routing Problem with the Deterministic Approach”, Journal of Engineering Science and Technology, Special Issue on ISSC’2016, 158 -168, 2017. [21] Zhong, Y., and Aghezzaf, E.-H, “Modeling andsolving the multi-period inventory routing problem with constant demand rates”, Proceedings of MOSIM'12, 2012.
|
This material may be protected under Copyright Act which governs the making of photocopies or reproductions of copyrighted materials. You may use the digitized material for private study, scholarship, or research. |