UPSI Digital Repository (UDRep)
|
|
|
Full Text : |
Industrialized building system has been introduced in Malaysia as an initiative to promote the construction sector. One of the systems that are in use IBS is blockwork system which is an evolution of the use of conventional brick. Making the block has several parts or processes that must be taken to produce the component. Planning the layout of a manufacturing industry should be implemented taking into account all needs ranging from suppliers of raw materials until the final product to be distributed to customers. Supply chain management definitions focused on the physical movement of goods, i.e. total flow of materials from suppliers to end customers. From this we see SCM can help for designing the plant layout design. Workflow in and out of the raw material suppliers and the final product to the customer and facility management is necessary to ensure that employees or machine operator can perform the work safely and comfortably. The result shows that key management approach, proper planning and organized is the key facilitate the workflow of managing the layout of the production equipment and support services that are the backbone of a manufacturing industry |
References |
[1] Azman, M.N.A., Ahamad, M.S.S., Majid, T.A., Yahaya, A.S., Hanafi, M.H., “Statistical evaluation of pre selection criteria for industrialized building system (IBS),” Journal of Civil Engineering and Management, Vol.
19, No. 1, pp. S131–S140, 2013.
[2] Azman, M.N.A., Ahamad, M.S.S., Majid,T.A., Hanafi, M.H., “A study on the trend of the use of IBS components and the setting UP of IBS manufacturing factories in the
malaysian construction industry,” Malaysian Construction Research Journal, Vol. 9, No. 2,18-30, 2011.
[3] CIDB, “IBS Survey 2003 - A Survey on the Usage of Industrialised Building System in Malaysian Construction Industry,” Construction Industry Development Board,
Kuala Lumpur, 2003.
[4] CIDB, “Industrialised Building System Roadmap 2003-2010,” Construction Industry Development Board, Kuala Lumpur, 2003.
[5] Inglis C., Downton P., “Brickwork and Blockwork,”2013.file:///D:/Users/MY%20USER/Documents/ibs/
YOURHOME-MaterialsBrickworkAndBlockwork.pdf. (Access 15
May 2017)
[6] Inglis C., “Brickwork and Blockwork,” 2013. http://www.yourhome.gov.au/materials/brickw ork-and-blockwork
[7] Elsevier, “Block and Blockwork,” 2017.
http://v5.books.elsevier.com/bookscat/samples/
9780750669405/9780750669405.pdf.
[8] CIDB, “Modul M01 Pengenalan sistem bangunan berindustri IBS,” Construction Industry Development Board, Kuala Lumpur,2013.
[9] Mohd Nasrun, M.N., Wan Nadzri, O., Rohaizah S., Radzi I., “Factors Affecting Systematic Implementation of Reduce and Recycle in Construction Industry,” Int. J Sup.
Chain. Mgt Vol. 6, No. 1, March 2017.
[10] Oliver, R.K., Webber, M.D., “Supply Chain Management: Logistics Catches up with Strategy,” Outlook Cit. Christopher, M.G.: Logistics, The strategic issue. Chapman and Hall, London, 1992.
[11] Sinha, A., Kotzab, H., “Supply Chain Management: A Manaerial Approach,” New Delhi: McGraw-Hill Offices, 2012.
[12] Jones, T.C., Riley, D.W., “Using inventory
for competitive advantage through supply chain management,” International Journal of Physical Distribution & Logistics Management, Vol. 15, No.5, pp. 16-26, 1985.
[13] Tan, K.C., “A framework of supply chain management literature,” Eurpoean Journal of Purchasing and Supply Management, Vol. 7,pp. 39-48, 2001.
[14] Gunasekaran, A., Ngai, E., “Build-to-order supply chain management: a literature review and framework for development,” Journal of Operations Management, Vol. 23,
No. 5, pp. 423-451. ,2005.
[15] Ayağ, Z., “CAD Software Evaluation for Product Design to Exchange Data in a Supply Chain Network,” Int. J Sup. Chain. Mgt, Vol. 4, No. 1, March 2015.
[16] Othman, A.A., Veera, P.K.S., Sayuti, N.M.,
Shamsul Bahrin, A., “The Relationship between Supply Chain Integration, Just-InTime and Logistics Performance: A Supplier’s Perspective on the Automotive Industry in Malaysia,” Int. J Sup. Chain. Mgt Vol. 5, No. 1, March 2016.
[17] Lee, C.W., Kwon, I.G., Severance, D., “ Relationship between supply chain performance and degree of linkage among supplier, internal integration, and customer,”
Supply Chain Management: An International Journal, Vol. 12, No. 6, pp. 444–452, 2007.
[18] Douglas M., Lambert, Martha C. Cooper, Janus D. Pagh, "Supply Chain Management: Implementation Issues and Research Opportunities", The International Journal of
Logistics Management, Vol. 9, No. 2, pp.1- 20, 1998.
[19] Harland, C.M., Lamming, R.C., Cousins, P.D.,
“Developing the concept of supply strategy,” International Journal of Operations & Production Management, Vol. 19, No. 7, pp. 650-73, 1999.
[20] Tony, H., “Supply Chain Strategies : Demand
Driven And Customer Focused,” London: Routledge, 2013.
[21] Samuel J. Axtman, Joseph H. Wilck, “A Review of Aviation Manufacturing and Supply Chain Processes,” Int. J Sup. Chain. Mgt Vol. 4, No. 4, December 2015.
{22] Inc.(2017),
https://www.inc.com/encyclopedia/facilitylayout-and-design.html. (Access 1 June 2017) |
This material may be protected under Copyright Act which governs the making of photocopies or reproductions of copyrighted materials. You may use the digitized material for private study, scholarship, or research. |