Abdulsattar, O. A., Company, A. C., & Amman, P. O. B. (2017). Performance in
construction industry in post- conflict situations – iraq as a case study, (9), 188–
195.
Abu Bakar, A. H., Abd Razak, A., Abdullah, S., & Awang, A. (2009). Project
management success factors for sustainable housing: A framework. Retrieved
from http://eprints.usm.my/16076/1/ICCI09-_14_aidah_awang.pdf
Aga, D. A. (2016). Transactional leadership and project success: The moderating role
of goal clarity. In Procedia Computer Science (Vol. 100, pp. 517–525).
https://doi.org/10.1016/j.procs.2016.09.190
Ahadzie, D. K., Proverbs, D. G., & Olomolaiye, P. O. (2008). Critical success criteria
for mass house building projects in developing countries. International Journal
of Project Management, 26(6), 675–687.
https://doi.org/10.1016/j.ijproman.2007.09.006
Ajmal, M. M., & Koskinen, K. U. (2008). Knowledge transfer in project-based
organizations: An organizational culture perspective. Project Management
Journal, 39(1), 7–15. https://doi.org/10.1002/pmj.20031
Aksorn, T., & Hadikusumo, B. H. W. (2008). Critical success factors influencing
safety program performance in Thai construction projects. Safety Science, 46(4),
709–727. https://doi.org/10.1016/j.ssci.2007.06.006
Al-ghafly, M. A. (1995). Delay in the construction of public utility projects in Saudi
Arabia, 17(2), 1–246.
Al-Khalil, M. I., & Al-Ghafly, M. A. (1999). Delay in public utility projects in Saudi
Arabia. International Journal of Project Management, 17(2), 101–106.
https://doi.org/10.1016/S0263-7863(98)00020-9
Al-Moniter. (2016). Iraq’s failing construction projects. Retrieved November 9, 2016,
from https://www.al-monitor.com/pulse/.../iraq-construction-projects-failurecorruption.
html.
Al-Tmeemy, S. M. H. M., Abdul-Rahman, H., & Harun, Z. (2011). Future criteria for
success of building projects in Malaysia. International Journal of Project
Management, 29(3), 337–348. https://doi.org/10.1016/j.ijproman.2010.03.003
Alaarj, S., Zainal, A. M., & Bustamam, U. (2016). Mediating role of trust on the
effects of knowledge management capabilities on organizational performance.
Procedia - Social and Behavioral Sciences, 235(2016), 729–738. https://doi.org/10.1016/j.sbspro.2016.11.074
Albogamy, A., Scott, D., & Dawood, N. (2012). Addressing Construction Delays in
the Kingdom of Saudi Arabia. International Proceedings of Economics
Development & Research 45, 148–153. Retrieved from
http://www.ipedr.com/vol45/030-ICMTS2012-M10016.pdf
Alias, Z., Zawawi, E., & Yusof, K. (2014). Determining Critical success factors of
project management practice: A conceptual framework. Procedia - Social and
Behavioral Sciences, 153, 61–69. https://doi.org/10.1016/j.sbspro.2014.10.041
Alipour, F., & Karimi, R. (2011). Mediation role of innovation and knowledge
transfer in the relationship between learning organization and organizational
performance. International Journal of Business and Social Science, 2(19), 144–
147. Retrieved from
http://www.ijbssnet.com/journals/Vol_2_No_19_Special_Issue_October_2011/1
6.pdf
Alzahrani, J. I., & Emsley, M. W. (2013). The impact of contractors’ attributes on
construction project success: A post construction evaluation. International
Journal of Project Management, 31(2), 313–322.
https://doi.org/10.1016/j.ijproman.2012.06.006
Andersen, E. S., Birchall, D., Jessen, S. a., & Money, A. H. (2006). Exploring project
success. Baltic Journal of Management, 1(2), 127–147.
https://doi.org/10.1108/17465260610663854
Andersen, E. S., & Jessen, S. A. (2003). Project maturity in organisations.
International Journal of Project Management, 21(6), 457–461.
https://doi.org/10.1016/S0263-7863(02)00088-1
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects.
International Journal of Project Management, 24(4), 349–357.
https://doi.org/10.1016/j.ijproman.2005.11.010
Atkinson, R. (1999). Project management: cost time and quality two best guesses and
a phenomenon, it’s time to accept other success criteria. International Journal of
Project Management, 17(6), 337–342. https://doi.org/10.1016/S0263-
7863(98)00069-6
Aziz, R. F. (2013). Ranking of delay factors in construction projects after Egyptian
revolution. Alexandria Engineering Journal, 52(3), 387–406.
https://doi.org/10.1016/j.aej.2013.03.002
Badewi, A., & Shehab, E. (2016). The impact of organizational project benefits
management governance on ERP project success: Neo-institutional theory
perspective. International Journal of Project Management, 34(3), 412–428.
https://doi.org/10.1016/j.ijproman.2015.12.002
Bakker, R. M., Cambré, B., Korlaar, L., & Raab, J. (2011). Managing the project
learning paradox: A set-theoretic approach toward project knowledge transfer.
International Journal of Project Management, 29(5), 494–503.
https://doi.org/10.1016/j.ijproman.2010.06.002
Barber, E., & Warn, J. (2005). Leadership in project management: From firefighter to
firelighter. Management Decision, 43(7/8), 1032–1039.
https://doi.org/10.1108/00251740510610026
Barney, J. (1991). Special theory forum the resource-based model of the firm: origins,
implications, and prospects. Journal of Management.
https://doi.org/10.1177/014920639101700107
Barney, J. B. (2001). Resource-based theories of competitive advantage: A ten-year
retrospective on the resource-based view. Journal of Management, 27(6), 643–
650. https://doi.org/10.1016/S0149-2063(01)00115-5
Bartlett, J. E., Kotrlik, J. W., & Higgins, C. C. (2001). Organizational research:
Determining appropriate sample size in survey research. Information Technology,
Learning, and Performance Journal, 19(1), 43–50.
https://doi.org/10.1109/LPT.2009.2020494
Bekr, G. A. (2015). Causes of delay in public construction projects in Iraq. Jordan
Journal of Civil Engineering, 9(2), 149–162.
Belassi, Walid, Tukel, Oya, I. (1996). A new framework for determining critical
success / failure factors in projects, 14(3), 141–151.
Berssaneti, F. T., & Carvalho, M. M. (2015). Identification of variables that impact
project success in Brazilian companies. International Journal of Project
Management, 33(3), 638–649. https://doi.org/10.1016/j.ijproman.2014.07.002
Birmingham, David, W. (2014). Using research instruments- A guide for researchers.
Igarss 2014. https://doi.org/10.1007/s13398-014-0173-7.2
Bowen, P., Edwards, P., Lingard, H., & Cattell, K. (2014). Occupational stress and job
demand, control and support factors among construction project consultants.
International Journal of Project Management, 32(7), 1273–1284.
https://doi.org/10.1016/j.ijproman.2014.01.008
Brady, T., & Davies, A. (2012). Learning to deliver a mega-project: The case of
heathrow terminal 5. In Procuring Complex Performance: Studies of Innovation
in Product-Service Management (pp. 174–196).https://doi.org/10.4324/9780203842058
Bredillet, C., Tywoniak, S., & Dwivedula, R. (2015). What is a good project manager?
An Aristotelian perspective. International Journal of Project Management,
33(2), 254–266. https://doi.org/10.1016/j.ijproman.2014.04.001
Bryde, D. (2008). Perceptions of the impact of project sponsorship practices on
project success. International Journal of Project Management, 26(8), 800–809.
https://doi.org/10.1016/j.ijproman.2007.12.001
Bryde, D. J., & Robinson, L. (2005). Client versus contractor perspectives on project
success criteria. International Journal of Project Management, 23(8), 622–629.
https://doi.org/10.1016/j.ijproman.2005.05.003
Business Monitor International. (2017). Iraq infrastructure report. Retrieved from
https://store.bmiresearch.com/iraq-infrastructure-report.html
Buvik, M. P., & Rolfsen, M. (2015). Prior ties and trust development in project teams
– A case study from the construction industry. International Journal of Project
Management, 33(7), 1484–1494. https://doi.org/10.1016/j.ijproman.2015.06.002
Cattell, R. B. (1966). The scree test for the number of factors. Multivariate Behavioral
Research, 1(2), 245–276. https://doi.org/10.1207/s15327906mbr0102_10
Chan, A. P. C., Scott, D., & Chan, A. P. L. (2004). Factors affecting the success of a
construction project. Journal of Construction Engineering and Management,
130(1), 153–155. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153)
Chandra, H. P. (2015). Structural equation model for investigating risk factors
affecting project success in Surabaya. Procedia Engineering, 125, 53–59.
https://doi.org/10.1016/j.proeng.2015.11.009
Chen, L., & Fong, P. S. W. (2012). Revealing performance heterogeneity through
knowledge management maturity evaluation: A capability-based approach.
Expert Systems with Applications, 39(18), 13523–13539.
https://doi.org/10.1016/j.eswa.2012.07.005
Chileshe, N., & Haupt, T. C. (2012). Modelling Crtitical Success Factors of
Construction Project Management ( CPM ).
Chin, W. W., & Dibbern, J. (2010). Handbook of Partial Least Squares. Handbook of
Partial Least Squares. https://doi.org/10.1007/978-3-540-32827-8
Chou, J., & Pramudawardhani, D. (2015). Cross-country comparisons of key drivers ,
critical success factors and risk allocation for public-private partnership projects.
International Journal of Project Management, 33(In Press), 1–12.https://doi.org/10.1016/j.ijproman.2014.12.003
Chua, D. K. H., Kog, Y. C., & Loh, P. K. (1999). Critical success factors for different
project objectives. Journal of Construction Engineering Management, 125, 142–
150.
Cohen, J. (1988). The Effect Size index: d. In Statistical Power Analysis for the
Behavioral Sciences (pp. 20–26).
Cooke-Davies, T. (2002). The “real” success factors on projects. International Journal
of Project Management, 20(3), 185–190. https://doi.org/10.1016/S0263-
7863(01)00067-9
Cserháti, G., & Szabó, L. (2014). The relationship between success criteria and
success factors in organisational event projects. International Journal of Project
Management, 32(4), 613–624. https://doi.org/10.1016/j.ijproman.2013.08.008
Damoah, I. S., & Kumi, D. (2018). Causes of government construction projects failure
in an emerging economy: evidence from Ghana. International Journal of
Managing Projects in Business.
Davis, K. (2016). A method to measure success dimensions relating to individual
stakeholder groups. International Journal of Project Management, 34(3), 480–
493. https://doi.org/10.1016/j.ijproman.2015.12.009
de Carvalho, M. M., Patah, L. A., & de Souza Bido, D. (2015). Project management
and its effects on project success: Cross-country and cross-industry comparisons.
International Journal of Project Management, 33(7), 1509–1522.
https://doi.org/10.1016/j.ijproman.2015.04.004
DeFillippi, R. J., & Arthur, M. B. (1998). Paradox in project-based enterprise: The
case of film making. California Management Review, 40(2), 124–139.
https://doi.org/10.2307/41165936
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting
delays in Indian construction projects. International Journal of Project
Management, 30(4), 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004
Drucker, P. f. (1999). Knowledge-worker productivity : The biggest challenge.
California Management Review, 41(2), 79.
https://doi.org/10.1109/EMR.2006.1679053
Elkadi, H. (2013). Success and failure factors for e-government projects: A case from
Egypt. Egyptian Informatics Journal, 14(2), 165–173.
https://doi.org/10.1016/j.eij.2013.06.002
F. Hair Jr, J., Sarstedt, M., Hopkins, L., & G. Kuppelwieser, V. (2014). Partial least
squares structural equation modeling (PLS-SEM). European Business Review,
26(2), 106–121. https://doi.org/10.1108/EBR-10-2013-0128
Famakin, I. O., Aje, I. O., & Ogunsemi, D. R. (2012). Assessment of success factors
for joint venture construction projects in Nigeria. Journal of Financial
Management of Property and Construction, 17(2), 153–165.
https://doi.org/10.1108/13664381211246606
Fapohunda, J. A. (2014). Evaluation of site managers’ hindrances towards optimal
utilisation of construction resources. Journal of Engineering, Design and
Technology. https://doi.org/10.1108/JEDT-03-2012-0013
Farinde, O., & Sillars, D. (2012). A Holistic Success Model for the Construction
Industry. In Proceedings – EPOC 2012 Conference (pp. 1–21). Retrieved from
http://link.aip.org/link/JCEMD4/v135/i3/p207/s1&Agg=doi
Fink, L. (2014). The Effect of customer focus competence on construction project
performance. Procedia - Social and Behavioral Sciences, 119, 427–436.
https://doi.org/10.1016/j.sbspro.2014.03.048
Fraenkel, J. R., & Wallen, N. E. (2005). Validity and reliability. In How to design and
evaluate resaerch in education with PowerWeb (pp. 152–171).
Frödell, M., Josephson, P.-E., & Lindahl, G. (2008). Swedish construction clients’
views on project success and measuring performance. Journal of Engineering,
Design and Technology, 6(1), 21–32.
https://doi.org/10.1108/17260530810863316
Fung, H.-P. (2015). Moderating effects of project management experience, project
team size, project duration and project value size on the relationship between
project manager’s leadership roles and project team effectiveness in Malaysia.
Journal of Empirical Studies, 2(1), 17–33.
George, D., & Mallery, P. (2008). SPSS for Windows step by step: A simple guide and
reference. BrJHaematol.
Gepp, M., Hellmuth, A., Sch??ffler, T., & Vollmar, J. (2014). Success factors of plant
engineering projects. Procedia Engineering, 69, 361–369.
https://doi.org/10.1016/j.proeng.2014.02.244
Goh, M. H. (2016). Dictionary of Business Continuity Management. Business
Continuity Management Dictionary Series.
Golafshani, N. (2003). Understanding reliability and validity in qualitative research.
The Qualitative Research, 8(4), 597–607. Retrieved from http://www.nova.edu/ssss/QR/QR8-4/golafshani.pdf
Gold, A. H., Malhotra, A., & Segars, A. H. (2001). Knowledge management: an
organizational capabilities perspective. J. of Management Information Systems,
18(1), 185–214. https://doi.org/10.2307/40398521
Grant, R. (1996). Toward a knoweldge-based theory of the firm. Strategic
Management Journal, 17(S2), 109–122. https://doi.org/10.1002/smj.4250171110
Grant, R. (2010). Contemporary strategy analysis: Text & cases. International
Journal of Management Education (Vol. 8). https://doi.org/10.1111/j.1467-
9310.2006.00453_1.x
Graziano, A. M., & Raulin, M. L. (2010). Research Methods - A Process of Inquiry.
Science and Children.
Gudien, N., Ramelyt, L., & Banaitis, A. (2013). An Evaluation of critical success
factors for construction projects using expert judgment, 384–389.
Gudien?, N., Banaitis, A., Banaitien?, N., & Lopes, J. (2013). Development of a
conceptual critical success factors model for construction projects: A case of
Lithuania. Procedia Engineering, 57, 392–397.
https://doi.org/10.1016/j.proeng.2013.04.051
Hair, J. F., Anderson, R. E., Babin, B. J., Black, W. C. (2010). Multivariate Data
Analysis: A global perspective. Upper Saddle River (7th ed.). NJ: Pearson.
https://doi.org/10.1016/j.ijpharm.2011.02.019
Hair, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2006). Multivariate Data
Analysis (6th ed.). Analysis, 4–4.
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011). PLS-SEM: Indeed a silver bullet.
The Journal of Marketing Theory and Practice, 19(2), 139–152.
https://doi.org/10.2753/MTP1069-6679190202
Håkanson, L. (2010). The firm as an epistemic community: The knowledge-based
view revisited. Industrial and Corporate Change, 19(6), 1801–1828.
https://doi.org/10.1093/icc/dtq052
Hamel, G. (2000). Knowledge strategy. Executive Excellence, 17(7), 20. Retrieved
from
http://search.ebscohost.com/login.aspx?direct=true&db=bth&AN=3613374&lan
g=pt-br&site=ehost-live
Hanisch, B., Lindner, F., Mueller, A., & Wald, A. (2009). Knowledge management in
project environments. Journal of Knowledge Management, 13(4), 148–160. https://doi.org/10.1108/13673270910971897
Hart, S., & Banbury, C. (1994). How Strategy-making processes can make a
difference. Strategic Management Journal, 15(4), 251–269.
https://doi.org/10.1002/smj.4250150402
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009). The use of partial least squares
path modeling in international marketing. Advances in International Marketing,
20, 277–319. https://doi.org/10.1016/0167-8116(92)90003-4
Hernández, B., Jiménez, J., & Martín, M. J. (2010). Customer behavior in electronic
commerce: The moderating effect of e-purchasing experience. Journal of
Business Research, 63(9–10), 964–971.
https://doi.org/10.1016/j.jbusres.2009.01.019
Hughes, S. W., Tippett, D. D., & Thomas, W. K. (2004). Measuring project success in
the construction industry. Engineering Management Journal, 16(500), 31–37.
https://doi.org/10.1080/10429247.2004.11415255
Hussein, B. A., Ahmad, S. B. S., & Zidane, Y. J.-T. (2015). Problems associated with
defining project success. Procedia Computer Science, 64(1877), 940–947.
https://doi.org/10.1016/j.procs.2015.08.611
Hyvari, I. (2006). Success of Projects in different organizational conditions. Project
Management Journal, 37(4), 31–42. https://doi.org/10.1055/s-0029-1225353
Idoro, G. I. (2009). Clients’ perception of construction project leaders in the Nigerian
banking industry. Journal of Engineering, Design and Technology, 7(3), 264–
281. https://doi.org/10.1108/17260530910998686
Ihuah, P. W., Kakulu, I. I., & Eaton, D. (2014). A review of critical project
management success factors (CPMSF) for sustainable social housing in Nigeria.
International Journal of Sustainable Built Environment, 3(1), 62–71.
https://doi.org/10.1016/j.ijsbe.2014.08.001
Iqbal, S., Choudhry, R. M., Holschemacher, K., Ali, A., & Tamošaitien?, J. (2015).
Risk management in construction projects, 21(1), 65–78.
https://doi.org/10.3846/20294913.2014.994582
Jarkas, A., Radosavljevic, M., & Wuyi, L. (2014). Prominent demotivational factors
influencing the productivity of construction project managers in Qatar.
International Journal of Productivity and Performance Management, 63(8),
1070–1090. https://doi.org/10.1108/IJPPM-11-2013-0187
Jitwasinkul, B., Hadikusumo, B. H. W., & Memon, A. Q. (2016). A Bayesian Belief
Network model of organizational factors for improving safe work behaviors in
Thai construction industry. Safety Science, 82, 264–273.
https://doi.org/10.1016/j.ssci.2015.09.027
Joslin, R., & M??ller, R. (2015). Relationships between a project management
methodology and project success in different project governance contexts.
International Journal of Project Management, 33(6), 1377–1392.
https://doi.org/10.1016/j.ijproman.2015.03.005
Kaiser, H. F. (1991). Coefficient alpha for a principal component and the Kaiser-
Guttman rule. Psychological Reports, 68(3), 855–858.
https://doi.org/10.2466/pr0.1991.68.3.855
Kath, L. M., Magley, V. J., & Marmet, M. (2010). The role of organizational trust in
safety climate’s influence on organizational outcomes. Accident Analysis and
Prevention, 42(5), 1488–1497. https://doi.org/10.1016/j.aap.2009.11.010
Kerzner, H. (2009). Project management: A systems approach to planning,
scheduling, and controlling. New York. https://doi.org/10.1016/0377-
2217(82)90164-3
Khan, A. S., & Rasheed, F. (2015). Human resource management practices and
project success, a moderating role of Islamic Work Ethics in Pakistani projectbased
organizations. International Journal of Project Management, 33(2), 435–
445. https://doi.org/10.1016/j.ijproman.2014.08.006
Khan, R. A. G., Khan, F. A., & Khan, M. A. (2011). Impact of Training and
development on organizational performance. Global Journal of Management and
Business Research, 11(7), 63–69.
https://doi.org/10.1017/CBO9781107415324.004
Kim, T. H., Lee, J.-N., Chun, J. U., & Benbasat, I. (2014). Understanding the effect of
knowledge management strategies on knowledge management performance: A
contingency perspective. Information & Management, 51(4), 398–416.
https://doi.org/10.1016/j.im.2014.03.001
Kimberlin, C. L., & Winterstein, A. G. (2008). Validity and reliability of measurement
instruments used in research. American Journal of Health-System Pharmacy,
65(23), 2276–2284. https://doi.org/10.2146/ajhp070364
Kline, R. B. (2013). Principales and practice of Strutural equation modeling. Journal
of Chemical Information and Modeling (Vol. 53).
https://doi.org/10.1017/CBO9781107415324.004
Kline, R. B. (2015). Principles and practice of structural equation modeling. Guilford
publications.
Koops, L., Coman, L., Bosch-Rekveldt, M., Hertogh, M., & Bakker, H. (2015). Public
perspectives on project success – influenced by national culture? Procedia -
Social and Behavioral Sciences, 194(194), 115–124.
https://doi.org/10.1016/j.sbspro.2015.06.126
Koskela, L., & Howell, G. (2002). The theory of project management: Explanation to
novel methods. Proceedings 10th Annual Conference on Lean Construction, 1–
11. https://doi.org/10.1109/EMR.2008.4534317
Koskinen, K. U. (2000). Tacit knowledge as a promoter of project success. European
Journal of Purchasing & Supply Management, 6(1), 41–47.
https://doi.org/10.1016/S0969-7012(99)00033-7
Kulkarni, U. R., Ravindran, S., & Freeze, R. (2007). A knowledge management
success model: theoretical development and empirical validation. Journal of
Management Information Systems, 23(3), 309–347.
https://doi.org/10.2753/MIS0742-1222230311
Lee, S.-K., & Yu, J.-H. (2012). Success model of project management information
system in construction. Automation in Construction, 25, 82–93.
https://doi.org/10.1016/j.autcon.2012.04.015
Lehtimäki, T., Simula, H., & Salo, J. (2009). Applying knowledge management to
project marketing in a demanding technology transfer project: Convincing the
industrial customer over the knowledge gap. Industrial Marketing Management,
38(2), 228–236. https://doi.org/10.1016/j.indmarman.2008.12.008
Liao, S.-H., & Hu, T.-C. (2007). Knowledge transfer and competitive advantage on
environmental uncertainty: An empirical study of the Taiwan semiconductor
industry. Technovation, 27(6–7), 402–411.
https://doi.org/http://dx.doi.org/10.1016/j.technovation.2007.02.005
Liébana-Cabanillas, F., Sánchez-Fernández, J., & Muñoz-Leiva, F. (2014). The
moderating effect of experience in the adoption of mobile payment tools in
Virtual Social Networks: The m-Payment Acceptance Model in Virtual Social
Networks (MPAM-VSN). International Journal of Information Management,
34(2), 151–166. https://doi.org/10.1016/j.ijinfomgt.2013.12.006
Lim, C. S., & Mohamed, M. Z. (1999). Criteria of project success: An exploratory reexamination.
International Journal of Project Management, 17(4), 243–248.
https://doi.org/10.1016/S0263-7863(98)00040-4
Liphadzi, M., Aigbavboa, C., & Thwala, W. (2015). Relationship between leadership
styles and project success in the South Africa construction industry. Procedia
Engineering, 123, 284–290. https://doi.org/10.1016/j.proeng.2015.10.091
Lj Todorovi?, M., ? Petrovi?, D., Mihi?, M. M., Lj Obradovi?, V., & Bushuyev, S. D.
(2015). Project success analysis framework: A knowledge-based approach in
project management. Jpma, 33, 772–783.
https://doi.org/10.1016/j.ijproman.2014.10.009
Loforte Ribeiro, F., Leitão Tomásio Ferreira, V., Ribeiro, F. L., & Ferreira, V. L. T.
(2010). Using knowledge to improve preparation of construction projects.
Business Process Management Journal, 16(3), 361–376.
https://doi.org/10.1108/14637151011049403
Long, N. D., Ogunlana, S., Quang, T., & Lam, K. C. (2004). Large construction
projects in developing countries: A case study from Vietnam. International
Journal of Project Management, 22(7), 553–561.
https://doi.org/10.1016/j.ijproman.2004.03.004
Lowry, P. B., & Gaskin, J. (2014). Partial least squares (PLS) structural equation
modeling (SEM) for building and testing behavioral causal theory: When to
choose it and how to use it. IEEE Transactions on Professional Communication,
57(2), 123–146. https://doi.org/10.1109/TPC.2014.2312452
Lu, W., & Yuan, H. (2010). Exploring critical success factors for waste management
in construction projects of China. Resources, Conservation and Recycling, 55(2),
201–208. https://doi.org/10.1016/j.resconrec.2010.09.010
Mahmood, A., Asghar, F., & Naoreen, B. (2014). Success factors on research projects
at university: An exploratory study. Procedia - Social and Behavioral Sciences,
116, 2779–2783. https://doi.org/10.1016/j.sbspro.2014.01.655
Maslow, A. H. (1943). A theory of human motivation. Psychological Review, 50(4),
370–396. https://doi.org/10.1037/h0054346
McHugh, O., & Hogan, M. (2011). Investigating the rationale for adopting an
internationally-recognised project management methodology in Ireland: The
view of the project manager. International Journal of Project Management,
29(5), 637–646. https://doi.org/10.1016/j.ijproman.2010.05.001
Meskendahl, S. (2010). The influence of business strategy on project portfolio
management and its success - A conceptual framework. International Journal of
Project Management, 28(8), 807–817.
https://doi.org/10.1016/j.ijproman.2010.06.007
Miller, D., & Shamsie, J. (1996). The resource-based view of the firm in two
environments: The hollywood film studios from 1936 to 1965. Academy of
Management Journal, 39(3), 519–543. https://doi.org/10.2307/256654
Mills, A. M., & Smith, T. a. (2011). Knowledge management and organizational
performance: a decomposed view. Journal of Knowledge Management, 15(1),
156–171. https://doi.org/10.1108/13673271111108756
Müller, R., & Jugdev, K. (2012). Critical success factors in projects. International
Journal of Managing Projects in Business, 5(4), 757–775.
https://doi.org/10.1108/17538371211269040
Munns, A. K., & Bjeirmi, B. F. (1996). The role of project management in achieving
project success. International Journal of Project Management, 14(2), 81–87.
https://doi.org/http://dx.doi.org/10.1016/0263-7863(95)00057-7
Nahod, M.-M., & Radujkovi?, M. V. M. (2013). The impact of ICB 3.0 competences
on project management success. Procedia - Social and Behavioral Sciences, 74,
244–254. https://doi.org/10.1016/j.sbspro.2013.03.014
National Investment Commission. (2017). Investment map of Iraq 2017. Baghdad,
Iraq. Retrieved from
http://www.tamweelpartners.com/resources/Iraq_Investment_Map.pdf
Neef, D. (1999). Making the case for knowledge management: the bigger picture.
Management Decision, 37(1), 72–78.
https://doi.org/10.1108/00251749910252049
Nguyen, L. D., Ogunlana, S. O., & Lan, D. T. X. (2004). A study on project success
factors in large construction projects in Vietnam. Engineering, Construction and
Architectural Management, 11(6), 404–413.
https://doi.org/10.1108/09699980410570166
Nguyen, T. P., & Chileshe, N. (2015). Revisiting the construction project failure
factors in Vietnam. Built Environment Project and Asset Management, 5(4),
398–416. https://doi.org/10.1108/BEPAM-10-2013-0042
Nielsen, B. B., & Ciabuschi, F. (2003). Siemens shareNet: Knowledge management in
practice. Business Strategy Review, 14(2), 33–40. https://doi.org/10.1111/1467-
8616.00257
Oecd. (2011). Organisation for economic co-operation and development. Oecdorg, 55.
https://doi.org/10.1111/j.1467-8276.2005.00798.x
Ofori, D. F. (2013). Project management practices and critical success factors–a
developing country perspective. International Journal of Business and
Management, 8(21), 14–32. https://doi.org/10.5539/ijbm.v8n21p14
Ordanini, A., Rubera, G., & Sala, M. (2008). Integrating functional knowledge and
embedding learning in new product launches: How project forms helped EMI
music. Long Range Planning, 41(1), 17–32.
https://doi.org/10.1016/j.lrp.2007.11.001
Osei-kyei, R., & Chan, A. P. C. (2015). ScienceDirect review of studies on the critical
success factors for public – private partnership ( PPP ) projects from 1990 to
2013. JPMA, 33(6), 1335–1346. https://doi.org/10.1016/j.ijproman.2015.02.008
Özba?, G. K., Esen, M., & Esen, D. (2013). The impact of HRM capabilities on
innovation mediated by knowledge management capability. Procedia - Social
and Behavioral Sciences, 99, 784–793.
https://doi.org/10.1016/j.sbspro.2013.10.550
Pallant, J. (2013). SPSS survival manual: a step by step guide to data analysis using
SPSS. Step by step guide to data analysis using the SPSS program.
Pallant, J. (2016). SPSS survival manual: a step by step guide to data analysis using
SPSS. Step by step guide to data analysis using the SPSS program.
Pan, G., Pan, S.-L., & Lim, C.-Y. (2015). Examining how firms leverage IT to achieve
firm productivity: RBV and dynamic capabilities perspectives. Information &
Management, 52(4), 401–412. https://doi.org/10.1016/j.im.2015.01.001
Pandremmenou, H., Sirakoulis, K., & Blanas, N. (2013). Success factors in the
management of investment projects: A case study in the Region of Thessaly.
Procedia - Social and Behavioral Sciences, 74(May 1999), 438–447.
https://doi.org/10.1016/j.sbspro.2013.03.032
Papke-Shields, K. E., Beise, C., & Quan, J. (2010). Do project managers practice what
they preach, and does it matter to project success? International Journal of
Project Management, 28(7), 650–662.
https://doi.org/10.1016/j.ijproman.2009.11.002
Paulin, D., & Suneson, K. (2012). Knowledge transfer , knowledge sharing and
knowledge barriers – three blurry terms in KM. Electronic Journal of Knowledge
Management, 10(1), 81–91. https://doi.org/10.1108/14684520910951186
Petro, Y., & Gardiner, P. (2015). An investigation of the influence of organizational
design on project portfolio success, effectiveness and business efficiency for
project-based organizations. International Journal of Project Management,
33(8), 1717–1729. https://doi.org/10.1016/j.ijproman.2015.08.004
Polo Peña, A. I., Frías Jamilena, D. M., & Rodríguez Molina, M. ángel. (2013).
Antecedents of loyalty toward rural hospitality enterprises: The moderating effect
of the customer’s previous experience. International Journal of Hospitality
Management, 34(1), 127–137. https://doi.org/10.1016/j.ijhm.2013.02.011
Porter, M. (1985). Competitive advantage: Creating and sustaining superior
performance. New York (Vol. 15).
Powl, A., & Skitmore, M. (2005). Factors hindering the performance of Construction
project managers. Construction Innovation, 5(1), 41–51.
https://doi.org/10.1191/1471417505ci082oa
Probst, T. M. (2004). Safety and insecurity: exploring the moderating effect of
organizational safety climate. Journal of Occupational Health Psychology, 9(1),
3–10. https://doi.org/10.1037/1076-8998.9.1.3
Project Management Institute. (2013). A guide to the project management body of
knowledge (PMBOK ® guide). Project Management Institute.
https://doi.org/10.1002/pmj.20125
Quinn, J. B. (1992). Intelligent enterprise: A knowledge and service based paradigm
for industry. Intelligent Enterprise A Knowledge and Service Based Paradigm for
Industry, 473.
Rajasekar, S., Philominathan, P., & Chinnathambi, V. (2006). Research methodology.
Methods. https://doi.org/10.1097/AAP.0b013e3182208cea
Razif, A., Razak, A., Aini, A., Pandiyan, V., & Sundram, K. (2015). The relationships
of human success factor , information technology , and procurement process
coordination on operational performance in building construction industry – A
Proposed Conceptual Framework. Procedia Economics and Finance, 31(15),
354–360. https://doi.org/10.1016/S2212-5671(15)01209-5
Reich, B. H., Gemino, A., & Sauer, C. (2012). Knowledge management and projectbased
knowledge in it projects: A model and preliminary empirical results.
International Journal of Project Management, 30(6), 663–674.
https://doi.org/10.1016/j.ijproman.2011.12.003
Ribeiro, P., Paiva, A., Varaj??o, J., & Dominguez, C. (2013). Success evaluation
factors in construction project management - some evidence from medium and
large Portuguese companies. KSCE Journal of Civil Engineering.
https://doi.org/10.1007/s12205-013-0019-4
Rodgers, W., Negash, S., & Suk, K. (2005). The moderating effect of on-line
experience on the antecedents and consequences of on-line satisfaction.
Psychology and Marketing, 22(4), 313–331. https://doi.org/10.1002/mar.20061
Russ, F. A., & McNeilly, K. M. (1995). Links among satisfaction, commitment, and
turnover intentions: The moderating effect of experience, gender, and
performance. Journal of Business Research, 34(1), 57–65.
https://doi.org/10.1016/0148-2963(94)00042-D
Santos, V., & Varajão, J. (2015). PMO as a key ingredient of public sector projects’
success – position paper. Procedia Computer Science, 64, 1190–1199.
https://doi.org/10.1016/j.procs.2015.08.546
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992). Critical
success factors for construction projects. Journal of Construction Engineering
and Management, 118(1), 94–111. https://doi.org/10.1061/(ASCE)0733-
9364(1992)118:1(94)
Sedera, D., & Gable, G. G. (2010). Knowledge management competence for
enterprise system success. Journal of Strategic Information Systems, 19(4), 296–
306. https://doi.org/10.1016/j.jsis.2010.10.001
Sekaran, U., & Bougie, R. (2013). Research methods for business. In Research
methods for business (p. 436).
Shenhar, a J., & Wideman, R. M. (1997). Toward a Fundamental differentiation
between project types. Innovation in Technology Management: The Key to
Global Leadership, 1997 (July 1997).
https://doi.org/10.1109/PICMET.1997.653422
Silvius, A. J. G., & Schipper, R. (2015). A conceptual model for exploring the
relationship between sustainability and project success. Procedia Computer
Science, 64, 334–342. https://doi.org/10.1016/j.procs.2015.08.497
Somekh, B., & Lewin, C. (2005). Research methods in the social sciences. Social
Sciences (Vol. 36). https://doi.org/10.1111/j.1467-8535.2005.00515_7.x
Soon Han, W., Md Yusof, A., Ismail, S., & Choon Aun, N. (2011). Reviewing the
notions of construction project success. International Journal of Business and
Management, 7(1), 90–101. https://doi.org/10.5539/ijbm.v7n1p90
Sousa, C. M. P., & Tan, Q. (2015). Exit from a foreign market: Do poor performance,
strategic fit, cultural distance, and international experience matter? Journal of
International Marketing, 23(4), 84–104. https://doi.org/10.1509/jim.15.0003
Suliman, A. M., & Abdulla, M. H. (2005). Towards a high?performance workplace:
Managing corporate climate and conflict. Management Decision, 43(5), 720–733.
https://doi.org/10.1108/00251740510597734
Suliman, A. M., & Al Obaidli, H. (2011). Organizational climate and turnover in
Islamic banking in the UAE. International Journal of Islamic and Middle
Eastern Finance and Management, 4(4), 308–324.
https://doi.org/10.1108/17538391111186555
Tabassi, A. A., Roufechaei, K. M., Ramli, M., Bakar, A. H. A., Ismail, R., & Pakir, A.
H. K. (2016). Leadership competences of sustainable construction project
managers. Journal of Cleaner Production.
https://doi.org/10.1016/j.jclepro.2016.02.076
Taherdoost, H., & Keshavarzsaleh, A. (2016). Critical factors that lead to projects’
success/failure in global marketplace. Procedia Technology, 22, 1066–1075.
https://doi.org/10.1016/j.protcy.2016.01.151
Taillandier, F., Taillandier, P., Tepeli, E., Breysse, D., Mehdizadeh, R., & Khartabil,
F. (2015). A multi-agent model to manage risks in construction project
(SMACC). Automation in Construction, 58, 1–18.
https://doi.org/10.1016/j.autcon.2015.06.005
Tenenhaus, M., Vinzi, V. E., Chatelin, Y. M., & Lauro, C. (2005). PLS path
modeling. Computational Statistics and Data Analysis, 48(1), 159–205.
https://doi.org/10.1016/j.csda.2004.03.005
The World Bank. (2017). Doing Business: Measuring Business regulations. ISBN.
https://doi.org/10.1596/978-1-4648-0948-4
Thomas, G., & Fernández, W. (2008). Success in IT projects: A matter of definition?
International Journal of Project Management, 26(7), 733–742.
https://doi.org/10.1016/j.ijproman.2008.06.003
Toor, S.-R., & Ogunlana, S. O. (2009). Construction professionals’ perception of
critical success factors for large-scale construction projects. Construction
Innovation: Information, Process, Management, 9(2), 149–167.
https://doi.org/10.1108/14714170910950803
Toor, S. u R., & Ogunlana, S. O. (2008). Critical COMs of success in large-scale
construction projects: Evidence from Thailand construction industry.
International Journal of Project Management, 26(4), 420–430.
https://doi.org/10.1016/j.ijproman.2007.08.003
Venkatesh, V., Morris, M. G., Davis, G. B., & Davis, F. D. (2003). User acceptance of
information technology: Toward a unified view. MIS Quarterly: Management
Information Systems, 27(3), 425–478. Retrieved from
http://www.scopus.com/inward/record.url?eid=2-s2.0-
1542382496&partnerID=tZOtx3y1
Voelpel, S. C., & Han, Z. (2005). Managing knowledge sharing in China: The case of
Siemens ShareNet. Journal of Knowledge Management, 9(3), 51–63.
https://doi.org/10.1108/13673270510602764
Waqas, Z., & Saleem, S. (2014). The effect of monetary and non-monetary rewards on
employee engagement and firm performance. European Journal of Business and
Management, 6(31), 73–83.
Welter, C., Bosse, D. A., & Alvarez, S. A. (2013). The interaction between managerial
and technological capabilities as a determinant of company performance: An
empirical study of biotech firms. International Journal of Management. Mar2013
Part 2, 30(1), 272–284.
Widforss, G., & Rosqvist, M. (2015). The project office as project management
support in complex environments. In Procedia Computer Science (Vol. 64, pp.
764–770). https://doi.org/10.1016/j.procs.2015.08.626
Wright, P. M., Dunford, B. B., & Snell, S. A. (2001). Human resources and the
resource based view of the firm. Journal of Management, 27(6), 701–721.
https://doi.org/10.1016/S0149-2063(01)00120-9
Yalegama, S., Chileshe, N., & Ma, T. (2016). Critical success factors for communitydriven
development projects: A Sri Lankan community perspective. International
Journal of Project Management, 34(4), 643–659.
https://doi.org/http://dx.doi.org/10.1016/j.ijproman.2016.02.006
Yeong, A. (2010). Integrating knowledge management with project management for
project success. Journal of Project , Program & Portfolio Management, 1(2), 8–
19.
Yu, J.-H., & Kwon, H.-R. (2011). Critical success factors for urban regeneration
projects in Korea. International Journal of Project Management, 29(7), 889–899.
https://doi.org/10.1016/j.ijproman.2010.09.001
Yuan, Y., & Lee, J. (2012). Examining the role of knowledge transfer effect as a
mediator variable among impact factors in knowledge innovation, 7(2), 205–224.
Zhang, J., Soh, P. H., & Wong, P. K. (2010). Entrepreneurial resource acquisition
through indirect ties: Compensatory effects of prior knowledge. Journal of
Management, 36(2), 511–536. https://doi.org/10.1177/0149206308329963
Zhang, L., & Fan, W. (2013). Improving performance of construction projects: A
project manager’s emotional intelligence approach. Engineering, Construction
and Architectural Management, 20(2), 195–207.
https://doi.org/10.1108/09699981311303044
Zhao, D., Zuo, M., & Deng, X. (2014). Examining the factors influencing crossproject
knowledge transfer: An empirical study of IT services firms in China.
JPMA, 33, 325–340. https://doi.org/10.1016/j.ijproman.2014.05.003
Zqikael, O., Levin, C., & Rad, P. F. (2008). Top management support- the project
friendly organization. Cost Engineering, 50(9), 22–30. Retrieved from http://0-
search.ebscohost.com.library.vu.edu.au/login.aspx?direct=true&db=bth&AN=35
208887&site=bsi-live
Zwikael, O. (2008). Top management involvement in project management: Exclusive
support practices for different project scenarios. International Journal of
Managing Projects in Business, 1(3), 387–403.
https://doi.org/10.1108/17538370810883837