Abdullah, M. R., Kamar, K. A. M., Nawi, M. N. M., Haron, A. T., & Arif, M. (2009).
Industrialized Building System: A Definition and Concept. In ARCOM Conference
(pp. 7–9).
Abedi, M., Mohamad, M. F., & Fathi, M. S. (2011). Effects of Construction Delays on Construction
Project Objectives. The First Iranian Students Scientific Conference in Malaysia, 9 & 10 Apr 2011,
UPM, Malaysia, 1–8.
Abidin, A. R. Z. (2007). Simulation of industrialised building system formation for housing
construction. Master Project. Retrieved from http://eprints.utm.my/11242/
Ahmadian, F. F. A., Akbarnezhad, A., Rashidi, T. H., & Waller, S. T. (2016). Accounting for
Transport Times in Planning Off-Site Shipment of Construction Materials. Journal of
Construction Engineering and Management, 142(1).
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001030.
Ariffin, H. L. T., Lynn, B. Y. H., Shukery, N. M., Rahiman, N. A., Mahmud, S. H., & Raslim, F. M.
(2018). Innovative Procurement Adoption for Industrialised Building System (IBS) Projects.
International Journal of Engineering & Technology, 7, 887– 892.
Arnt Buvik. (2001). The industrial purchasing research framework: a comparison of theoretical
perspectives from micro economics, marketing and organization science. Journal of Business &
Industrial Marketing, 16(6), 439–450. https://doi.org/10.1108/EUM0000000006019
Ashraf, M., Fateh, M., & Mohammad, M. F. (2018). Industrialized Building System ( IBS
) Provision in Local and International Standard Form of Contracts. Journal of Construction in
Developing Countries, 22(2), 67–80.
Azman, M.N.A., Dzulkalnine, N., Hamid, Z. A., & Bing, K. W. (2014). Payment issue in Malaysian
construction industry: Contractors’ perspective. Jurnal Teknologi
(Sciences and Engineering), 70(1). https://doi.org/10.11113/jt.v70.2804
Azman, M.N.A., Mohamed Nor Azhari, Dzulkalnine, N., Kamar, K. A. M., Hamid, Z. A., & Nawi, M. N. M.
(2013). CIB 2013 World Congress Payment Scenario in the Malaysian Construction Industry Prior to
CIPAA.
Badir, Y. F., Kadir, M. R. A., & Hashim, A. H. (2002). Industrialized Building Systems Construction
in Malaysia. Journal of Architectural Engineering, 8(March).
Baharuddin, A., Rahman, A., & Omar, W. (2006). Issues and Challenges in the Implementation of
Industrialised Building Systems in Malaysia. In Proceedings of the 6th Asia-Pacific Structural
Engineering and Construction Conference (ASPEC 2006) (pp. 5–6).
Bank Negara Malaysia (BNM). (2018). Loans Applied by Sectors. Bank Negara Malaysia (BNM).
Begum, R. A., Satari, S. K., & Pereira, J. J. (2010). Waste Generation and Recycling : Comparison
of Conventional and Industrialized Building Systems. AmericalnJournal of Environmental
Sciences, 6(4), 383–388.
Bland, J. M., & Altman, D. G. (1997). Statistics notes: Cronbach’s alpha.
https://doi.org/http://dx.doi.org/10.1136/bmj.314.7080.572
Blismas, N. (2007). Off-site manufacture in Australia : Current state and future directions CRC for
Construction Innovation participants ER SE AR. Public Works. Retrieved from
http://www.construction- innovation.info/images/pdfs/Publications/Industry_publications/Off-
site_manufacture_in_Australia.pdf
Bloor, M., Frankland, J., Thomas, M., & Kate Robson. (2001). Focus Groups in Social Research. SAGE.
Bower, D. (2003). Management of Procurement. (D. Bower, Ed.) (1st Editio). London: Thomas Telford.
Retrieved from http://www.thomastelford.com
Chung, L. P. (2006). IMPLEMENTATION STRATEGY FOR INDUSTRIALISED
BUILDING SYSTEM. Universiti Teknologi Malaysia (UTM).
https://doi.org/10.1017/CBO9781107415324.004
CIDB. (2002). Survey on Problems Faced by Contractors in Raising Finance.
CIDB. (2003). Industrialised building systems (IBS) - roadmap 2003-2010, (72), 1–24.
CIDB. (2007). Construction Industry Master Plan Malaysia 2006-2015. … . Construction Industry
Development Board Malaysia. Retrieved from
http://scholar.google.com/scholar?hl=en&btnG=Search&q=intitle:Construction+In
dustry+Malaysia+Master+Plan,+Malaysia+2006-2015#0
CIDB. (2009). The Feasibility of Guaranteed Maximum Price (GMP) Contract for Public Sector
Construction Projects. Kuala Lumpur: CIDB
CIDB. (2010). IBS-Roadmap 2011-2015. Construction Industry Development Board Malaysia.
Retrieved from http://www.cidb.gov.my/cidbv4/?option=com_content&view=article&id=594:ibs-
roadmap-2011-2015&catid=57&Itemid=577&lang=en
CIDB. (2012). Report on the Effectiveness of Industrialised Building System (IBS) for Government
Projects (1st ed.). CIDB.
CIDB. (2015a). Construction Industry Transformation Programme (CITP) 2016-2020.
https://doi.org/10.1007/s13398-014-0173-7.2
CIDB. (2015b). IBS Digest. CIDB, 33.
CIDB. (2017). CITP Report No. 3 Q4 2017.
CIDB, MPC, REHDA, & CREAM. (2014). An Introduction of Industrialised Building System Manual for
Developer. CIDB.
Construction Industry Development Board (CIDB). (2018). Construction Industry Review & Prospect
2018 / 2019. (Construction Industry Development Board (CIDB), Ed.). Kuala Lumpur: Construction
Industry Development Board (CIDB).
Creswell, J. W. (2012). Overview of Mixed Methods Research in Dissemination and
Implementation.Thousand Oaks: SAGE Publications Inc
Creswell, J. W. (2013). Research Design: Qualitative, Quantitative and Mixed Methods Approaches
(4th ed.). Thousand Oaks: SAGE Publications Inc
Creswell, J. W., & Clark, V. L. P. (2011). Designing and Conducting Mixed Methods Research (2nd
ed.). SAGE.
Crosthwaite, D. (2000). The Global Construction Market: A Cross Sectional Analysis. Construction
Management and Economics, 18(5), 619–627. https://doi.org/10.1080/014461900407428
Central Unit of Procurement (CUP). (1993). HM Treasury: Central Unit on Procurement ; Guidance
Note No 41 Managing Risks and Contigency for Works Projects. London: CUP
Dalalah, D., Al-oqla, F., & Hayajneh, M. (2010). Application of the Analytic Hierarchy Process (
AHP ) in Multi- Criteria Analysis of the Selection of Cranes. Jordan Journal of Mechanical and
Industrial Engineering, 4(5), 567–578.
Morgan. (1998). The Focus Group Guidebook.Portland: SAGE Publications Inc
Department of Statistics (DOS). (2018). Quarterly Construction Statistics, Second Quarter 2018.
Department of Statistics, Malaysia, (February), 1–2. Retrieved from
https://www.statistics.gov.my/index.php?r=column/cthemeByCat&cat=77&bul_id
=RlBvVUUwNVZnb0NkL2I2UnBjOUZhUT09&menu_id=OEY5SWtFSVVFVU pmUXEyaHppMVhEdz09
Doloi, H. (2008). Application of AHP in improving construction productivity from a management
perspective. Construction Management and Economics, 26(8), 841– 854.
https://doi.org/10.1080/01446190802244789
Egbu, C., & Abdullah, M. (2011). Industrialised Building System in Malaysia: Issues for Research in
Changing Financial and Property Market. In Proceedings of the BUHU 9th International Post Graduate
Research Conference. University of Salford. Retrieved from http://usir.salford.ac.uk/12820/
Engineering News Record (ENR). (2005). World Market Overview. Ohio: McGraw-Hill Construction,.
Fewings, P., & Henjewele, C. (2019). Construction Project Management. (Routledge, Ed.) (Third
Edit). New York: Routledge.
Franks, J., & Harlow, P. A. (1984). Building Procurement Systems: A Guide to Building Project
Management (2nd ed.). Chartered Institute of Building.
George, D., & Mallery, P. (2003). SPSS for Windows Step by Step: Answers to Selected Exercises. A
Simple Guide and Reference. https://doi.org/9780335262588
Gibb, A. G., & Isack, F. (2003). Re-engineering through pre-assembly - client expectations and
drivers. Building Research & Information, 31, 146–160. https://doi.org/10.1080/09613210302000
Gibbons, J. H. (1986). Technology, Trade and the U.S. Residential Construction Industry.Washington,
DC:U.S. Government Printing Office
Glass, J. (2000). The Future for Precast Concrete in Low-Rise Housing.Oxford: British Precast
Hamouda, H., & Abu-shaaban, N. (2015). Enhancing Labour Productivity Within Construction Industry
Through Analytical Hierarchy Process , the Case of Gaza Strip, 3(8), 329–336.
https://doi.org/10.13189/ujm.2015.03080
Hassim, S., Jaafar, M. S., & Sazalli, S. A. A. H. (2009). The Contractor Perception Towers
Industrialised Building System Risk in Construction Projects in Malaysia. American Journal of
Applied Sciences, 6(5), 937–942.
Ibrahim, M., Mohammad, M., Nekooie, A., Binti, N., & Kamaruddin, C. (2012). The Adequacy of
Contractual Provisions in Managing Construction Failure in Malaysia. European Journal of Business
and Management, 4(1), 22–38. Retrieved from
http://www.iiste.org/Journals/index.php/EJBM/article/view/1023/943
Jaafar, M., & Radzi, N. M. (2013). Level of Satisfaction and Issues with Procurement Systems used
in the Malaysian Public Sector. Australasian Journal of Construction Economics and Building, 13(1),
50.
Jalil, Ahmad Abd, Jaafar, M., Mydin, A. O., & Nuruddin, A. R. (2017). The Application of
Procurement Systems in IBS Housing Project. International Journal Supply Chain Management, 6(4),
299–307.
Jalil, Ahmad Abd, Nuruddin, A. R., Jaafar, M., & Mydin, A. O. (2015). New Procurement Method for
Housing Projects Implementing IBS Modular System. In International Conference on Advances in Civil
and Environmental Engineering (pp. 1–8).
Jalil, Ahmad Abdul, Jaafar, M., Mydin, A. O., & Nuruddin, A. R. (2017). How Industry Players
Perceived Payment Issues in Industrialised Building System (IBS) Housing Projects? Malaysian
Construction Research Journal, 2(2), 22–35.
James Dean Brown. (1996). Testing in Language Programs. (Dominick Mosco, Ed.).
New Jersey: Prentice Hall Regents.
Jenny Kitzinger. (2008). The Methodology of Focus Groups: The Importance of Interaction between
Research Participants. Sociology of Health & Illness, 16(1), 103–121.
https://doi.org/10.1111/1467-9566.ep11347023
Southern, J. (2016). Smart Construction. Aberdeen: KPMG
Kamar, K.A.M., Hamid, Z. A., & Dzulkalnine, N. (2012). Industrialised Building System (IBS)
construction: Measuring the perception of contractors in Malaysia. In BEIAC 2012 - 2012 IEEE
Business, Engineering and Industrial Applications Colloquium.
https://doi.org/10.1109/BEIAC.2012.6226077
Kamar, K. A. M., & Hamid, Z. A. (2011). Supply chain strategy for contractor in adopting
industrialized building system (IBS). Australian Journal of Basic and Applied …, 5(12), 2552–2557.
Retrieved from http://ajbasweb.com/old/ajbas/2011/December- 2011/2552-2557.pdf
Kamar, K. A. M., Hamid, Z. A., & Mustapha Alshawi. (2009). Barriers To Industrialized Building
System (IBS): The Case of Malaysia. In Built and Human Environment 9th International Postgraduate
Research Conference (pp. 1–16).
Kamar, K. A. M., Hamid, Z. A., Zain, M. Z. M., & Ahmad Hazim Abd. Rahim. (2008). Industrialised
Building Systems (IBS): The Current State Malaysia and R&D Initiatives. Construction Research
Institute of Malaysia (CREAM).
Kapliński, O., & Tamošaitiene, J. (2010). Game theory applications in construction engineering and
management. Technological and Economic Development of Economy, 16(2), 348–363.
https://doi.org/10.3846/tede.2010.22
Khalfan, M. M. A., Mcdermott, P., & Vrijhoef, R. (2005). The effect of procurement on the
integration of the supply chain within the construction industry. In Understanding the
Construction Business and Companies (pp. 14–25).
Krippendorff, K. (2012). Content Analysis: An Introduction to Its Methodology.
California:SAGE Publications.
Kuder, G. F., & Richardson, M. W. (1937). The theory of the estimation of test reliability.
Psychometrika, 2(3), 151–160. https://doi.org/10.1007/BF02288391
Lessing, J., Stehn, L., & Ekholm, A. (2005). Industrialised Housing –Definition and Categorization
of the Concept. In International Group of Lean Construction Conference no 13.
Lewis, W. A. (2014). W . Arthur Lewis ’ s Theory of Economic Growth : a Review with 50 years of
Foresight Derick Boyd University of East London.
Li, H. X., Al-Hussein, M., Lei, Z., & Ajweh, Z. (2013). Risk identification and assessment of
modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation. Canadian
Journal of Civil Engineering, 40(12), 1184–1195. https://doi.org/10.1139/cjce-2013-0013
Lincoln, Y. S., & Guba, E. G. (1985). Naturalistic Inquiry. (C. Beverly Hills, Ed.). SAGE
Publications.
Losby, J., & Wetmore, A. (2012). Using Likert Scale in Evaluation Survey Work.
California:CDC.
Love, P. E. D. (2002). Influence of Project Type and Procurement Method on Rework Costs in Building
Construction Projects, (February), 18–29.
Macharis, C., Springael, J., Brucker, K. De, & Verbeke, A. (2004). PROMETHEE and AHP: The Design of
Operational Synergies in Multicriteria Analysis: Strengthening PROMETHEE with Ideas of AHP.
European Journal of Operational Research. https://doi.org/10.1016/S0377-2217(03)00153-X
Malaysian Productivity Corporation (MPC). (2017a). Construction Labour Productivity in Malaysia.
Kuala Lumpur: MPC
Malaysian Productivity Corporation (MPC). (2017b). Summary of Issues and Recommendations.
Kuala Lumpur: Malaysia Productivity Corporation (MPC).
Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016). Cost analysis for sustainable
off-site construction based on a multiple- case study in China. Habitat International, 57, 215–222.
https://doi.org/10.1016/j.habitatint.2016.08.002
Marhani, M. A., Adnan, H., Baharuddin, H. E., Esa, M. R., & Hassan, A. A. (2012). Dependency of
Foreign Workers in Malaysian Construction Industry, 9(1), 39–50.
Masterman, J. W. E. (2005). An Introduction to Building Procurement Systems. (J. W. E. Masterman,
Ed.) (Second). New York: Spon Press.
Melik, S. (2010). Cash Flow Analysis of Construction Projects Using. Middle East Technical
University.
Michnik, J., & Lo, M. (2005). Enhancement of Financial Risk Management With the Aid of Analytic
Hierarchy Process. In International Symposium on the Analytic Hierarchy Process.
Millet, I., & Wedley, W. C. (2002). Modelling Risk and Uncertainty with the Analytic Hierarchy
Process. Journal of Multi-Criteria Decision Analysis, 11(2), 97–107.
https://doi.org/https://doi.org/10.1002/mcda.319
Milošević, A., Milošević, M., Milošević, D., & Selimi, A. (2016). AHP Multi-Criteria Method for
Sustainable in Construction. In Conference Proceedings International Conference (pp. 929–938).
https://doi.org/10.14415/konferencijaGFS
Ministry of Finance (MOF). (2008). Perlaksanaan Industrialised Building System (IBS) dalam projek
kerajaan (Vol. 3). Kuala Lumpur: MOF
Ministry of International Trade and Industry (MITI). (2019). Cabotage Policy. Retrieved from
https://www.miti.gov.my/index.php/glossary/term/184
Modular Building Institute. (2018). Modular Construction. Retrieved from
http://www.modular.org/HtmlPage.aspx?name=why_modular
Mohammed, A. H., & Ahmad, I. (2002). Pengurusan Projek Binaan: Pembiayaan dan Pengawalan Kos yang
Berkesan (2nd ed.). Dewan Bahasa dan Pustaka Kuala Lumpur.
Ghafar, M. N. A., (2003). Reka Bentuk Tinjauan Soal Selidik Pendidikan. Universiti Teknologi
Malaysia (UTM).
Morledge, R., & Smith, A. (2013). Building Procurement. (R. Morledge & A. Smith, Eds.) (2nd
Editio). Sussex: Wiley-Blacwell.
Moscarini, G., & Postel-Vinay, F. (2009). Large Employers Are More Cyclically Sensitive.
https://doi.org/10.3386/w14740
Musa, M. F., Mohammad, M. F., Yusof, M. R., & Mahbub, R. (2014). The Way Forward Industrialised
Building System (IBS) in Malaysia. In InCIEC 2014: Proceedings of the International Civil and
Infrastructure Engineering Conference 2014 (pp. 163– 173). Springer.
Nawi, M. N. M., Lee, A., Kamar, K. A. M., & Hamid, Z. A. (2012). A Critical Literature Review on
the Concept of Team Integration in Industrialised Building System (IBS) Project. Malaysian
Construction Research Journal, 9(1), 17.
Nawi, M. N. M., Mydin, M. A. O., Nursal, A. T., Nifa, F. A. A., & Bahaudin, A. Y. (2015). Payment
issues in Malaysia Industrialised Building System ( IBS ): Literature visit Payment issues in
Malaysia Industrialised Building System ( IBS ): Literature visit. AENSI Journals, 9(4), 185–188.
Nawi, N. M., Mydin, A. O., Nursal, A. T., Akmar, F., Nifa, A., & Hanafi, M. H. (2015). Payment
issues in Malaysia Industrialised Building System ( IBS ): A Research Framework, 9(March), 88–91.
Nee, T. S., & Wei, C. L. (2013). Selection Criteria and the Related Sub-Criteria for the Selection
of Standard Form of Contract for Construction Projects in Sarawak. UNIMAS E-Journal of Civil
Engineering, 4(2), 33–38.
Ngowi, A. B., Pienaar, E., & Mbachu, J. (2005). Globalisation of the construction industry: A
review of infrastructure financing. Journal of Financial Management of Property and Construction.
https://doi.org/http://dx.doi.org/10.1108/13664380680001079
NHBC Foundation. (2016). Modern Methods of Construction: views from the industry. IHS BRE
Press. Retrieved from
http://www.nhbcfoundation.org/Publications/Primary-Research/Modern-methods- of-construction-NF70
Nunnally, J. C., & Bernstein Ira H. (n.d.). Psychometric Theory (3rd ed.). New York: McGraw-Hill
Education (India) Pvt Limited.
Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007). Perspectives of UK housebuilders on the use of
offsite modern methods of construction. Construction Management and Economics, 25(2), 183–194.
Pan, W., Sidwell, R., Pan, W. E. I., & Sidwell, R. (2011). Demystifying the cost barriers to
offsite construction in the UK Demystifying the cost barriers to offsite construction in the UK.
Construction Management and Economics, 29(November 2014), 1081–1099.
https://doi.org/10.1080/01446193.2011.637938
Peldschus, F., Zavadskas, E. K., Turskis, Z., & Tamošaitiene, J. (2010). Sustainable Assessment of
Construction Site by Applying Game Theory. Inzinerine Ekonomika- Engineering Economics, 21(3),
223–237.
Perera, N., & Sutrisna, M. (2010). The Use of Analytic Hierarchy Process (AHP) in the Analysis of
Delay Claims in Construction Projects in the UAE. The Built & Human Environment Review, 3(1),
29–47.
Persatuan Arkitek Malaysia (PAM). (2010). ARCHITECT ’ S PERSPECTIVE ON IBS.
Pozin, M. A. A., & Nawi, M. N. M. (2017). The communication in industrialised building system ( IBS
) construction project : Virtual environment The communication in industrialised building system (
IBS ) construction project : Virtual environment Mohd Affendi Ahmad Pozin , and Mohd Nasrun Mohd N.
In AIP Conference Proceedings (p. 7). https://doi.org/10.1063/1.5005358
Rakhmatullin, R. (2016). Learning Together: Peer Review Methodology. Seville: European Commision
Ramanathan, R. (2001). A note on the use of the analytic hierarchy process for environmental impact
assessment. Journal of Environmental Management, 63(1), 27–35.
https://doi.org/10.1006/jema.2001.0455
Richard, R. B. (2006). Industrialised , Flexible and Demountable Building Systems : Quality ,
Economy and Sustainability. The CRIOCM 2006 International Symposium on “Advancement of
Construction Management and Real Estate” INDUSTRIALISED, (Richard 2005), 1–11.
Rogan, a L., Lawson, R. M., & Bates-Brkljac, N. (2000). Value and Benefits Assessment of Modular
Construction. In Modular Matters Conference (pp. 1–24). Retrieved from
http://www.designforhomes.org/wp-
content/uploads/2012/03/ModularSteel.pdf
Bruno, R. (2007). A Generic Classification of Industrialised Building System. In Open Building
Manufacturing: Core Concepts and Industrial Requirements (pp. 53–66). ManuBuild.
Retrieved from
http://scholar.google.com/scholar?hl=en&btnG=Search&q=intitle:Open+Building+
Manufacturing+Core+Concepts+and+Industrial+Requirements#0%5Cnhttp://schol
ar.google.com/scholar?hl=en&btnG=Search&q=intitle:Open+Building+Manufactu
ring:+Core+Concepts+and+Industrial+
Saaty, T. L. (1980). The Analytic Hierarchy Process. New York: McGraw Hill.
Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of
Services Sciences, 1(1), 83. https://doi.org/10.1504/IJSSCI.2008.017590
Saaty, T. L., & Vargas, L. G. (2012). Models, Methods, Concepts & Applications of the Analytic
Hierarchy Process. Pittsburgh:Springer.
Sajjad Zahir. (1999). Clusters in a Group: Decision Making in the Vector Space Formulation of the
Analytic Hierarchy Process. European Journal of Operational Research.
https://doi.org/10.1016/S0377-2217(98)00021-6
Sekaran, U., & Bougie, R. (2010). Research Methods for Business: A Skill Building Approach (5th
ed.). Chichester: John Wiley & Sons.
Serrano-Cinca, C., & Gutiérrez-Nieto, B. (2013). A Decision Support System for Financial and
Social Investment. Applied Economics. https://doi.org/10.1080/00036846.2012.748180
Sherri, L. Jackson. (2012). Research Methods and Statistics: A Critical Approach (4th Editio).
Belmont: Cengage Learning.
Shukor, A. S. A., Mohammad, M. F., Mahbub, R., & Faridah Ismail. (2011). Supply chain integration
challenges in project procurement in Malaysia: The perspective of IBS manufacturers. Association of
Researchers in Construction Management, ARCOM 2011 - Proceedings of the 27th Annual Conference,
1(September 2011), 495–504. Retrieved from
http://www.scopus.com/inward/record.url?eid=2-s2.0-
84861044849&partnerID=40&md5=37bdafccb50a60d54b5a33e07bfb80d7
Stewart, D. W., & Shamdasani, P. N. (2015). Focus Group: Theory and Practices (3rd ed.). Portland:
SAGE.
Sum, R. M. (2013). Risk Management Decision Making. In Proceeding of the International Symposium on
the Analytic Hierarchy Process. Retrieved from www.cranfield.ac.uk/cds/cfda
Tabish, S. Z. S., & Jha, K. N. (2011). Construction Management and Economics Identification and
evaluation of success factors for public construction projects Identification and evaluation of
success factors for public construction projects. Construction Management and Economics,
29(8), 809–823. https://doi.org/10.1080/01446193.2011.611152
Thanoon, W. A., Peng, L. W., Kadir, M. R. A., Jaafar, M. S., & Salit, M. S. (2003). the Essential
Characteristics of Industrialised Building System. International Conference on Industrialised
Building Systems, Kuala Lumpur, Malaysia, (1999), 10–11.
Todd D. Jick. (1979). Mixing Qualitative and Quantitative Methods: Triangulation in Action.
Administrative Science Quarterly, 24(4), 602–611.
Torki, L., Dalali Isfahani, R., & Rezai, A. (2013). Ranking of financial and electronic debts using
analytic hierarchy process (AHP). New Marketing Research Journal, 21–30.
https://doi.org/10.1109/ECDC.2013.6556751
Trikha, D. N., & Ali, A. A. A. (2004). Industrialised Building Systems. Universiti Putra Malaysia
(UPM).
Vichare, V. K., Aher, M. C., & Devalkar, R. V. (2015). Application Of Analytical Hierarchy Process
In Construction Of Residential Building Project. International Journal of Modern Trends in
Engineering and Research. Retrieved from www.ijmter.com
Vignesh, S., & Shanmugapriya, S. (2016). Improvement of Decision Making Process in Construction
Supply Chain Management using Analytical Hierarchy. International Journal of Emerging Technology
and Advanced Engineering, 6(4), 109–118.
Vrijhoef, R. (1998). Co-makership in Construction towards Construction Supply Chain Management.
Delft University of Technology.
Walker, A. (2015). Project Management in Construction (1st ed.). Sussex: Wiley Blackwell.
Whitaker, R. (2007). Validation examples of the Analytic Hierarchy Process and Analytic
Network Process. Mathematical and Computer Modelling, 46, 840–859.
https://doi.org/10.1016/j.mcm.2007.03.018
Wiley, J. (1984). Construction Funding: Where the Money Comes From (2nd ed.).
Sussex: A Wiley-Interscience Publication.
Xue, H., Zhang, S., Su, Y., & Wu, Z. (2017). Factors Affecting the Capital Cost of Prefabrication —
A Case Study of China. Sustainability Journal, 1512(7), 1–22. https://doi.org/10.3390/su9091512
Xue, H., Zhang, S., Su, Y., & Wu, Z. (2018). Capital Cost Optimization for Prefabrication : A
Factor Analysis Evaluation Model. Journal of Sustainability, 159(10), 1–22.
https://doi.org/10.3390/su10010159
Yousefi, V., Golkhandan, A. R., Kiani, S., Yakhchali, S. H., & Mehrabanfar, E. (2015). Ranking of
Financing Methods in Iran Construction Renovation Projects: A Sensitivity Analysis Approach.
Mediterranean Journal of Social Sciences, 6(5S2), 303–309.
https://doi.org/10.5901/mjss.2015.v6n5s2p303
Zakaria, Z., Ismail, S., & Yusof, A. M. (2013). An Overview of Comparison between Construction
Contracts in Malaysia : The Roles and Responsibilities of Contract Administrator in Achieving Final
Account Closing Success. In International Conference on Education and Educational Technologies (pp.
34–41).
Zala, M. I., & Bhatt, R. B. (2011). An Approach of Contractor Selection By Analytical Heirarchy
Process. In National Conference on Recent Trends in Engineering & Technology (pp. 1–6).
Zawawi, M. (2009). Effectiveness of Industrialised Building System (IBS) Implementation for
Malaysian Construction Industry. Skudai: UTM
Zimmer, S., Klumpp, M., & Abidi, H. (2012). Industry Project Evaluation with the Analytic Hierarchy
Process. In Information Security Conference. Retrieved from
www.fom-ild.de