[1] Mohammed, J. 2015. Underground Structures Support, Stress & Strain of Tunnel.
[2] Yavuz, H. 2006. Support Pressure Estimation for Circular and Non-Circular Openings Based on a Parametric Numerical Modelling Study. The South African Institute of Mining and Metallurgy SA ISSN 0038–223X/3.00 + 0.00. pp.129-138.
[3] Ingerslev, C. (2010). Immersed and floating tunnels. Procedia Engineering, 4, 51–59. https://doi.org/10.1016/j.proeng.2010.08.007.
[4] Ongodia, J.E. (2018). Geotechnical Engineering Design of a Tunnel Support System - A Case Study of Karuma (600MW) Hydropower Project. April 2017, 227.
[5] Spackova, O. 2012. Risk Management of Tunnel Construction Projects. PhD_
Dissertation Czech Technical University in Prague.
[6] ITA, 2009. General Report on Conventional Tunneling Method ( No. 002). International
Tunneling Association (ITA) ISBN: 978-2-9700624-1-7 No.002.
[7] Arshad, & Abdullah, R. A. (2016). A review on selection of tunneling method and parameters effecting ground settlements. Electronic Journal of Geotechnical Engineering, 21(14), 4459–4475.
[8] Farrokh, E., Rostami, J., 2009. Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project. Tunnelling and Underground Space Technology 24, 436–446.Ong, D. E. L., & Choo, C. S. (2016). Back-analysis and finite element modeling of jacking forces in weathered rocks. Tunnelling and Underground Space Technology, 51, 1–10. https://doi.org/10.1016/j.tust.2015.10.014.
[9] Yazdani-Chamzini, A., & Yakhchali, S. H. (2012). Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods. Tunnelling and Underground Space Technology, 30, 194–204. https://doi.org/10.1016/j.tust.2012.02.021.
[10] RTM, 2009. Technical Manual for Design and Construction of Road Tunnels -Civil Elements Road Tunnel Manual (RTM) FHWA-NHI-09-010 U.S. Department of Transportation Federal Highway Administration Publication No. FHWA-NHI-10-034.
[11] Hung, J., Monsees, J., Munfah, N., & Wisniewski, J. (2009). Technical Manual for Design and Construction of Road Tunnels — Civil Elements. National Highway Institute, December, 702.
[12] Fasihnikoutalab MH, Huat BBK, Asadi A, Daneshmand S, 2012. Numerical stability analysis of tunnel by PLAXIS. Electronic Journal of Geotechnical Engineering, 17: 451–461.
[13] Franzius JNN, 2002. Behavior of building due to tunnel induced settlement. University of London, Imperial College of Science Technology and Medicine, PhD thesis, 360p.
[14] Yoo, C. (2004). Interaction between tunnelling and groundwater. Tunnelling and Underground Space Technology, 19(4–5), 523–524. https://doi.org/10.1016/j.tust.2004.02.117.
[15] Ong, D & Choo , C. (2016). Back-analysis and fine element modelling of jacking forces
in weathered rocks. Tunnelling and underground space technology, 51(1), 1-10.